home login search menu close-circle arrow-dropdown-up arrow-dropdown arrow-down arrow-up close hide show info jump-link play tip external fullscreen share view arrow-cta arrow-button button-dropdown button-download facebook youtube twitter tumblr pinterest instagram googleplus linkedin email blog lock pencil alert download check comments image-carousel-arrow-right show-thick image-carousel-arrow-left user-profile file-upload-drag return cta-go-arrow-circle circle circle-o circle-o-thin square square-o square-o-thin triangle triangle-o triangle-o-thin square-rounded square-rounded-o square-rounded-o-thin cta-go-arrow alert-exclamation close-thick hide-thick education-students globe-international cloud sign-in sign-out target-audience class-materials filter description key-learning pdf-file ppt-file zip-file plus-thick three-circle-triangle transcript-outline

Keyboard ALT + g to toggle grid overlay

5D project scheduling includes time and cost

NAVISWORKS MANAGE, NAVISWORKS SIMULATE

Simulate construction project scheduling in 5D to visually communicate and analyze project activities and minimize delays and sequencing problems.

  • Help confirm building or demolition viability by developing construction or demolition sequences that link model geometry to times and dates.
  • Import times, dates, costs, and other task data from project management software to dynamically link schedules with project models.
  • Set up planned and actual times to visualize deviations from the project schedule.
  • Export 5D simulations as AVI animations or sequential images.
  • Customize simulation behavior and overlay text.
  • Use CSV Import/Export for 2-way interoperability with other applications.
  • Copy and paste dates from spreadsheets and specialist planning tools.
  • Use tools to associate geometry and tasks quickly and easily.
5D project scheduling covers time and cost